UPS Load Testing


The motive of a UPS load bank testing is to accurately impersonate the operational or actual load that a power source will see in actual functions and testing UPS batteries to verify the battery capacity. It’s better to help to verify the proper operation of the entire system, and for the future loading. All the power characteristics parameter of the UPS power output will monitored during the test for the future evaluation. We provide a contained, organized and fully controllable UPS load bank tester and our UPS testing load banks are completely competent of new UPS commissioning and testing or during the maintenance period with accurate load control eg. 3 kW to 5000 kW in 230/400 Volt. We carry out load unbalance test, steadily load rising test and Overload test during the test.

Our engineering team excellently handling UPS load bank testing and load testing UPS batteries, we measure various power quality parameters during the load test, based on that we submit our study report after successful test completion.

We respond to your queries with lightening fast speed.


  • Your Name:*
  • Your Number:*
  • E-mail:*
  • Select:*