Transformer Load Testing


The motive of load bank testing a transformer is to accurately impersonate the operational or actual load that a power source will see in actual functions. It’s better to help to verify the proper operation of the entire system, and for the future loading. All the power characteristics parameter of the transformer power output will monitored during the load testing for the future evaluation. We provide a contained, organized and fully controllable load bank and our load banks are completely competent of basic transformer installation and testing with accurate load control eg. 3kW to 5000kW in 230/400Volt. We carry out load unbalance test, steadily load rising test and Overload test during the test.

Our engineering team excellently handling transformer testing, and we measure various power quality parameters during the load testing of transformer, based on that we submit our study report after successful test completion.

We respond to your queries with lightening fast speed.


  • Your Name:*
  • Your Number:*
  • E-mail:*
  • Select:*